Pre-1940 stone farmhouse in Ireland being retrofitted under the Traditional Homes Pilot
Home › Traditional Homes Grant Ireland

Traditional Homes Grant Ireland

Pre-1940 solid-wall and stone homes are excluded from the standard insulation grant for good reason. Here’s how the Traditional Homes Pilot works instead, breathable materials, no fixed BER target.

Pre-1940 Homes No Fixed BER Target Not Means-Tested
270,000
Pre-1940 Dwellings in Ireland
€1,500–4,500
Internal Insulation Grant
~100
Homes Sought for Pilot
16%
Of Private Housing Stock

Why Traditional Homes Need a Different Approach

Traditional homes, generally built before 1940, are constructed differently from modern housing: solid masonry or stone walls without a cavity, lime-based renders and mortars, and timber or metal-framed windows. These buildings were designed to manage moisture by breathing, allowing air and moisture to pass through the wall structure.

Modern insulation and renders are often non-breathable. Applying them to a traditional wall can trap moisture and cause overheating or mould rather than solve the original problem. Traditional homes are explicitly not eligible for the standard individual wall insulation grant, this is a genuine technical distinction, not a bureaucratic technicality.

Eligible homes: pre-1940s properties with solid masonry or stone walls, lime-based render, and traditional timber or metal-framed windows. Approximately 270,000 dwellings in Ireland predate 1945, around 16 percent of the private housing stock.

Traditional Homes Pilot vs Standard OSS

Standard OSS / Better Energy HomesTraditional Homes Pilot
BER targetB2 or betterNo fixed target
MaterialsMineral wool, EPS, PIRBreathable: lime plaster, hemp, breathable cork/lime render
ScopeIndividual measures availableWhole-house only
ProviderAny registered OSS providerOSS provider + Traditional Building Professional

In many cases, an A-rated traditional home isn’t achievable without compromising the building’s original fabric. The approach is to apply upgrades appropriate to the specific building, not chase a specific letter grade.

A Published SEAI Case Study

Gortavalla Farmhouse

50mm Breathable Insulation, Both Sides of the Wall

This pre-1940 stone farmhouse used 50mm external and 50mm internal breathable cork/lime insulating plaster on the stone walls, alongside an air-to-water heat pump replacing an oil boiler and stove back boiler, underfloor heating on the ground floor, high-output radiators upstairs, and a mechanical ventilation heat recovery (MVHR) system to match the improved airtightness.

0.36–0.31
U-value achieved (W/m²K)
9–10 wks
Window & door lead time
Jan–Dec
2025 project timeline

Lime plaster drying time ran longer than expected, extending the schedule. SEAI’s own notes describe the pilot as “a welcome alternative to the other SEAI grant schemes, especially because it recognised the sensitive approach required when working with older buildings.”

Breathable Materials and Methods

Breathable Lime Plaster

Allows airflow through stone walls, often required for older masonry construction.

Hemp Insulation

Breathable and sustainable, suited to traditional wall build-ups.

Cork/Lime Breathable Plaster

Used internally and externally, as demonstrated in SEAI’s own case study.

Secondary Glazing

Retains original single-pane windows while improving thermal performance.

Heat Pump + Underfloor Heating

Modern heat pump technology paired with traditional-appropriate distribution.

MVHR

Matches improved airtightness with mechanical ventilation heat recovery.

How It Works

Confirm Your Home Qualifies

Generally pre-1940, solid masonry or stone walls, lime-based render, traditional windows.

Select an Experienced OSS Provider

They’ll engage a Traditional Building Professional as part of the process.

Building Fabric Analysis

A comprehensive assessment of construction type and condition, including thermal bridge assessment.

Retrofit Strategy Developed

Conservation-led, breathable, reversible interventions specific to your building.

Application and Whole-House Works

The OSS provider applies to SEAI and manages insulation, heating, windows, and ventilation together.

Completion and BER Assessment

Confirms the improvement achieved, without a fixed target grade.

Limitations

Inappropriate materials cause real damage. Standard modern insulation and renders can trap moisture in a traditional wall, leading to overheating or mould. Avoiding this is the entire premise of the pilot.

Not Available as a Single Measure

The pilot is a whole-house upgrade programme. A homeowner wanting wall insulation alone doesn’t qualify through this route.

Cannot Combine With Certain Other Schemes

A homeowner eligible for the Vacant Property Refurbishment Grant or Croí Cónaithe cannot also fund identical works through the Traditional Homes Pilot.

Longer Timelines Are Common

Specialist material lead times and lime plaster drying times extended the schedule on SEAI’s own published case study.

Capacity Is Limited

SEAI has stated it’s seeking around 100 traditionally constructed homes to participate, not an open-ended scheme in the same way as standard grants.

Traditional Homes Questions

Pre-1940 solid-wall and stone homes are explicitly excluded from the standard Better Energy Homes wall insulation grant. The standard materials aren’t appropriate for this construction type. The Traditional Homes Pilot provides the equivalent support using breathable, conservation-appropriate materials instead.
No. Unlike the standard One Stop Shop route, which targets B2, the Traditional Homes Pilot has no fixed BER target. In many cases an A rating isn’t achievable without compromising the building’s original fabric, so the approach is to apply upgrades appropriate to the specific home.
Breathable options such as lime plaster, hemp insulation, and breathable cork/lime insulating renders. These allow the wall to continue managing moisture the way it was originally designed to, avoiding the trapped-moisture problems modern non-breathable materials can cause.
The pilot is for whole-house energy upgrades only. It’s not available as a single measure like standard wall insulation grants are.
Longer than a typical modern retrofit. SEAI’s own case study saw window and door lead times of 9 to 10 weeks and longer-than-expected lime plaster drying times, both extending the project schedule.
No. Unlike the Warmer Homes Scheme, there’s no income limit for the Traditional Homes Pilot. See our full grants guide for how every SEAI scheme compares.

Own a Pre-1940 Home?

RetrofitIreland.ie connects you with One Stop Shop providers experienced in traditional buildings. Get a free assessment.

Get Your Free Quote →